PRE-CONSTRUCT HANDOVER CHECKLIST


Before you start

The pre-construct handover checklist outlines the requirements that must be met before the pre-construct design can be submitted to us.


The checklist

Download the checklist here.


Download pdf

Pre-construct Handover Checklist

Download (PDF - 494 KB)

Completed the checklist?

If you have completed the checklist and you are ready, submit your pre-construct designs to us for review.