Before you start
The As-built handover checklist outlines the requirements that must be included in your as-built designs. You should refer to this checklist before you complete and submit your as-built designs as part of the Notice of Practical Completion (PCN).
The checklist
Download the checklist here.
Completed the checklist?
If you have completed the checklist and you are ready, submit your as-built designs to us for review.